Wet coring has two systems that matter more than the drill: water in and slurry out. Get either wrong and the bit overheats, the floor floods, or both.
| Core size | Flow needed | Notes |
|---|---|---|
| 25-50 mm | 2-3 L/min | Garden tap with a proper hose is usually enough |
| 50-100 mm | 3-5 L/min | Use a flow valve at the rig |
| 100-200 mm | 5-8 L/min | Dedicated supply, not a shared tap |
| 200 mm+ | 8-12 L/min | Tank and pump if supply is uncertain |
Pressure matters less than flow. A 3 bar supply with a restricted hose delivers less water than a 1.5 bar supply with a clear line. Check at the bit, not at the tap.
Slurry is not drain-safe. It settles, hardens and blocks drains, and in many jurisdictions it is classified as trade waste. Options: settle in a tank or drum and dispose of the solids as construction waste, or use a slurry bag and dewater. Never hose it into a storm drain.
Turn the water off 15-20 mm before the bit exits the wall. Running water as the bit breaks through washes out the edge and can flood the far side, which is exactly where the finish usually matters.
Most water problems on a coring job are supply problems dressed as cutting problems: a bit that glazes, a core that binds and a segment that wears out in half the expected life are often just starved of flow. Choose the supply before the rig is positioned.
| Source | Practical flow | Best for | Fails when |
|---|---|---|---|
| Building tap with a regulated hose | 6-12 l/min at 2-3 bar | Short runs, one rig, indoor work | Shared supply drops pressure when another tap opens |
| Tank plus pump (25-100 l) | 10-20 l/min controlled | No tap nearby, upper floors, remote sites | Tank runs dry mid-hole and nobody notices |
| Pressure vessel or mains-fed cart | 15-25 l/min | Large diameter, deep holes, multiple rigs | Refill logistics on a long shift |
A 100 mm core at 300 mm depth needs roughly 15-25 litres of water, most of which returns as slurry. Sizing the supply to the hole, not to the hose, is the difference between a clean cut and a glazed crown.
The containment has to be built to survive a hose popping off at full flow. That is the failure that actually happens, and it happens at the worst possible moment: mid-cut, with the operator's hands full.
Judging flow by the sound of the hose is guesswork. Judge it at the crown, where the water has to do its work.
Most spills happen at the end, when the cut is finished and attention has already moved on. Run water for 15-30 seconds after the bit clears the hole, let the vacuum take the last of it, then shut the water off before breaking the hose connection. Draining the line into a bucket rather than onto the floor is the difference between finishing clean and mopping a corridor at the end of the shift.
A 20-minute setup for water and containment saves an hour of cleanup, and it is the difference between a wet core and a flood.