Average response time: under 24 hours

Chips on a tiled floor almost always appear at breakthrough or at the start, not in the middle of the hole. The tile is a hard brittle skin over a softer body, and the moment the bit leaves that skin it grabs. Control those two moments and the hole comes out clean.
| Location | Cause | Fix |
|---|---|---|
| Ring at the start | Bit walked before it bit | Guide plate or a 45-degree start |
| Edge blown at exit | Pressure with no support | Back off in the last 5 mm, support the far side |
| Brown glazed edge | Heat, no water, too high rpm | Lower rpm, wet cut, fresh segment |
| Cracked tile | Hammer action | Rotary only, never hammer |
| Uneven hole | Bit wobble or worn core | Rigid bit, check runout |
On sound tile with a diamond bit and no hammer, a clean hole with a crisp edge is normal. On a tile already drummy or cracked, no bit rescues it: tap the tile first, and if it sounds hollow, price a replacement rather than a perfect hole. Drill a test hole in an offcut or a hidden corner on every new tile type.
Chipped tile edges are almost never caused by a bad bit. They come from impact, from heat, from a hole started off-centre, and from drilling with the tile's glaze left unsupported underneath.
| Cause | What it looks like | Fix |
|---|---|---|
| Hammer action on entry | Crescent-shaped chips on one side | Rotary only, or start in a pilot plate |
| Bit skidding off the mark | Scratches then a ragged bite | Centre punch, masking tape, or a guide bush |
| Heat from a dry core | Crazing and small flakes around the rim | Wet cut, or slow dry with extraction |
| Breakthrough shock | Large chip on the exit side | Cut from both sides, reduce feed at exit |
| Void or unbonded tile | Chip extends beyond the hole | Check for hollow tiles before drilling |
Two of those are operator errors and three are process decisions. Sorting which one you are looking at after the fact is harder than preventing all five, and prevention costs a few minutes per hole.
The order matters more than the tools. Punching before drilling, piloting before coring and clamping before breakthrough removes most of the ways a tile edge can fail.
No drilling method guarantees a chip-free edge on every tile. What can be promised is a defined process, a repair standard and a cost for the rare failure, which is what most clients actually need to hear.
Setting that expectation before the first hole is cheaper than arguing about a 4 mm chip after handover. It also protects the crew from being blamed for a tile that was already debonded.
Some chipped tile is unavoidable, and the difference between a complaint and an accepted result is how the repair looks and when it happens.
Budget a spare tile per room if the tiles are still available. It is cheaper than any repair method and it removes the argument entirely.
Charge for the water and the time. A dry fast hole is the one the customer photographs at handover.
Written and reviewed by JOY TECH — an SGS & BV audited, CE/RoHS certified diamond tools manufacturer founded in 2004, exporting to 50+ countries.
Our factory and QMS are audited by SGS and Bureau Veritas. Products meet CE/RoHS requirements and every piece is 100% inspected before packing.
Verified Certificates