A two-car garage (about 40 m2) takes one day to prep: clean, patch cracks, grind with a 30/46 metal-bond disc on a push grinder, vacuum, and apply epoxy the same evening. The goal is a CSP 3 profile—uniformly scratched, no glossy patches.
See the tooling range in our concrete grinding discs category.
Yes. New slabs are usually troweled smooth and need a CSP 3 for epoxy.
You can, but grinding is more uniform and avoids acid disposal.
Wait 7 days for the epoxy to fully cure, even if it feels dry.
Garage epoxy lives on prep. Patch, 30/46 grind, 120 follow-up, vacuum, and coat the same day. contact JOY TECH for a starter tooling kit sized to your grinder.